My intention was to start adding grout to the new river panels but decided to finish building the extra panels. I laid out all the new, unfinished panels along side both the old panels and the proposed panels ( the raw foam in the upper left corner) to get an idea how much more materials I will need:
All the old panels needed 1" by 2" frames built for them as well so I picked up another 100' of 1" by 2" boards, another 3 sheets of 1/4" plywood and one more 2' square piece of 1" foam. I think after this I will have enough panels for just about any battle we want to fight!
Once all the panels were done, I used Polyblend's Sanded Caulk (Coffee Bean) as a base in the river bottom:
I then started the process of gluing down a layer of Polyblend Sanded Grout (Coffee Bean again) as I did with the Wagram and Alma boards:
No comments:
Post a Comment